Ideas from AI Engineer talks Curated by Alex Vidal (@dobleio) and Borja Pérez (@borjaperfra) 76 ideas · 101 talks · 5 events

The Engineering Brief

Agents multiplied the projects Ronacher started but not the ones he keeps maintaining

Armin Ronacher of Earendil shows a year of his own data: agent working time grew to many times his workday and he started 141 repositories, while his prompts per day and the projects he actively maintains stayed roughly flat.

Armin RonacherEarendilAIE CODE 20262 min read
Watch from 4:45

Recording by AI Engineer.

The idea

The speaker’s argument, in our words.

Ronacher's data separates two curves that are easy to blur. The prompts he sends stayed roughly flat over the year, at about 120 to 190 a day, while the time his agents spent working climbed. Of the 141 repositories he created, the number he commits to on more than five days and keeps returning to stayed at roughly 10 to 15. He says an informal survey of friends showed the same pattern.

His reading is that human attention sets the pace; he avoids calling people the bottleneck but says they are what paces the machines. A friend fully automated an open-source project (issues in, an agent reviews, commits and replies) and later switched it off because he no longer cared enough about the project to spend tokens on it. Ronacher also notes that the extra volume lands on shared systems, from code hosts to old websites, that were not built for agent traffic.

What they found

From the talk. Figures are self-reported unless stated.
  • Prompts he sends per day stayed roughly flat over the year at about 120 to 190, while agent active time grew from under a workday to many times a workday.

    Self-measured; one person's usage data shown as graphs.

    Measured result

    5:57
  • He created 141 Git repositories over the year, but the number he commits to on more than five days and returns to stayed at roughly 10 to 15.

    His own repositories. The 141 also appears on the slide described in the conference article. He adds that an informal survey of friends showed a similar trend, with no data.

    Measured result

    6:40
  • A friend automated an open-source project end to end (issue intake, agent review, commit) and later turned it off because he no longer cared about the project and wanted the tokens for other things.

    Second-hand anecdote, unnamed project.

    Case study

    7:12
  • Agent activity is putting load on external systems such as code hosts and older websites that are not ready for the new volume.

    No figures given.

    Speaker opinion

    5:18

Why it matters

Our reading. Not said in the talk.

Productivity stories often count output started. If maintenance capacity is set by human attention, a team that starts more projects with agents may also be accumulating software nobody looks after.

What one could try

  • Track both projects started and projects with recent sustained commits, as Ronacher does, and watch the gap.
  • Before automating a project's issue handling, name who decides whether it is still worth running.

Limitations

  • One prolific individual's data; teams and other users may differ.
  • The friend survey and the external-load observation are anecdotal.
  • The five-day threshold for an actively maintained project is the speaker's own definition.

Original sources

This is our synthesis of the talk, checked against the transcript at the linked moments.

Related ideas